Skip to main content

New 3S Prodains Gondola To Open This Summer

Prodains lift opens 11th July

featured in News & Reviews Author Robin Deering, Avoriaz Editor Updated

After this winters last minute opening of the new 3S Prodains Express on the 13th of April, Avoriaz have confirmed the new lift will be operational for the summer - opening on the 11th of July.

Opening slightly later than other lifts in the Portes du Soleil, the new lift is still undergoing a few optimisations, whilst lift personnel are being trained on the new system.
The new Prodains lift uses '3S technology' meaning it uses 2 carrying cables and 1 hauling cable. The lift can transport between 2,000 and 2,400 passengers per hour (current lift can only manage 450 people an hour) and takes less than 5 minutes to get to the top.

All this with a very low CO2 emission levels, this is possibly the fastest & greenest way up to Avoriaz.
One thing is for sure, it will be great for spectators of the Morzine Avoriaz Road Bike Climb in August.

News

  • Where to cool down in  this summer 2019
  • What's on in Avoriaz summer 2018, Avoriaz
  • Latest gear - best new clothing for spring 2019
  • Latest gear - Mountain running equipment for 2019
  • Latest gear - Camping equipment for summer 2019
  • a mountain biker jumping in the air

Events

  • Trail des Hauts Forts,
  • Craft Festival, Avoriaz July 2023
  • Avoriaz Dance Festival
  • Inaugural Morzine - Montriond Triathlon
  • UCI Mountain Bike World Series, Les Gets
  • An image of a car at the Morzine Mont Blanc Rally